Mobilization of rigs with camp from Kuwait to Iraq with over 130 trucks dispatched.
Product
Oil & Gas, Qatar
Plant expansion - 147,000 tons of cargo transported in gas-debottle necking project.
Product
Transporting Generators, Norway
Moving generator “made to fit” a tunnel 500 meters inside a mountain. Total of 40 parcels with the heaviest weighing 80 tons.
Product
Power Plant, Mew-Kuwait
Handling of Gas Turbines and Generators ranging from 234 tons to 279 tons as well as cross loading onto receivers trailers.
Product
Step 4: Demobilisation
Plans to dispose assets, redeploy or dismiss personnel and possibly reinstate premises to their pre-project condition are created and executed.
Product
Step 3: Execution
Operations begin. Monitor and control processes are implemented to manage time, cost, quality, change, risks and issues, as well as procurement and communication.
Product
Step 2: Mobilisation
Materials and equipment are incorporated into the project and arrangements for personnel and other essential resources are organised.
Product
Step 1: Planning
Options are identified and screened based on your requirements. A solution is selected, a concept developed and a preliminary plan developed.