We perform thorough follow-up with information and communication with regards to cost and disbursement accounts.
Product
Well Drilling, Iraq
Mobilization of rigs with camp from Kuwait to Iraq with over 130 trucks dispatched.
Product
Oil & Gas, Qatar
Plant expansion - 147,000 tons of cargo transported in gas-debottle necking project.
Product
Transporting Generators, Norway
Moving generator “made to fit” a tunnel 500 meters inside a mountain. Total of 40 parcels with the heaviest weighing 80 tons.
Product
Power Plant, Mew-Kuwait
Handling of Gas Turbines and Generators ranging from 234 tons to 279 tons as well as cross loading onto receivers trailers.
Product
Step 4: Demobilisation
Plans to dispose assets, redeploy or dismiss personnel and possibly reinstate premises to their pre-project condition are created and executed.
Product
Step 3: Execution
Operations begin. Monitor and control processes are implemented to manage time, cost, quality, change, risks and issues, as well as procurement and communication.
Product
Step 2: Mobilisation
Materials and equipment are incorporated into the project and arrangements for personnel and other essential resources are organised.
Product
Step 1: Planning
Options are identified and screened based on your requirements. A solution is selected, a concept developed and a preliminary plan developed.