Supplier brand guide search

We found 1825 search results.

You can search the Supplier brand guide here

Showing 141-150 of 1825 search results
    • Product
      Safety_L2P1746_16-9

      Liferaft exchange

      Our Rental and Exchange programme launched in 2008 changed the liferaft market forever: Renting rafts, rather than owning, is now preferred onboard most vessels.
    • Product
      WSS port agent  operations

      All in-port services

      We perform all in-port services needed, like vessel boarding, monitoring of vessel operations and coordination of booked services, i.e. tank cleaning.
    • Product
      Pre departure planning

      Pre-arrival Planning

      We perform pre-arrival planning for your port call, including e.g. coordination of vessel service, cargo and documentation.
    • Product
      Post port departure

      Post departure follow up

      We perform thorough follow-up with information and communication with regards to cost and disbursement accounts.
    • Product
      Wells drilling project

      Well Drilling, Iraq

      Mobilization of rigs with camp from Kuwait to Iraq with over 130 trucks dispatched.
    • Product
      Qatar - Plant Expansion - Thumbnail

      Oil & Gas, Qatar

      Plant expansion - 147,000 tons of cargo transported in gas-debottle necking project.
    • Product
      Exploration Drilling - Moving Generator

      Transporting Generators, Norway

      Moving generator “made to fit” a tunnel 500 meters inside a mountain. Total of 40 parcels with the heaviest weighing 80 tons.
    • Product
      Handling of gas turbines - power plant

      Power Plant, Mew-Kuwait

      Handling of Gas Turbines and Generators ranging from 234 tons to 279 tons as well as cross loading onto receivers trailers.
    • Product
      mobilisation

      Step 4: Demobilisation

      Plans to dispose assets, redeploy or dismiss personnel and possibly reinstate premises to their pre-project condition are created and executed.
    • Product
      execution logisitics

      Step 3: Execution

      Operations begin. Monitor and control processes are implemented to manage time, cost, quality, change, risks and issues, as well as procurement and communication.
  • UPC-NEO NG PLASMA CUTTER (UPH-125) COMPLETE


  • HOSE CLAMP FOR 3/8" HOSE (10 PCS


  • HOSE CLAMP FOR 1/4" HOSE (10 PCS


  • UNITOR DYNAMIS/ PPE KIT 500 BAR


  • SET MALE/FEMALE PLUG 4P 63A IP67


  • CONSUMABLES KIT F/UPC-NEO NG


  • CONSUMABLES UPH-125 SET FOR UPC-NEO NG


  • UNITOR AEROFLOW DOUBLE DIAPHRAGM PUMP 1/2 INCH PP


  • UNITOR AEROFLOW DOUBLE DIAPHRAGM PUMP 3/8 INCH PP


  • UNITOR AEROFLOW DOUBLE DIAPHRAGM PUMP 2 INCH SS